XGN2-12 box fixed metal-enclosed switchgear

Oroduct Overview

ZHE JIANG BOGUANG ELECTRICAL TECHNOLOGY CO.,LTD. has been committed to product quality control and enterprise management "manufacturing high-quality goods, integrity service" is always our commitment to the customer. The company produces crystal sales of customers is the main power supply bureau, the company (hereafter called sacsc), mechanical and electrical equipment company, best-selling domestic provinces and cities autonomous regions, many times by the national key factory, export Europe and Africa southeast Asia etc, in use process to get the user high praise!

Product Overview

XGN2-12 box-type fixed metal-enclosed switchgear (referred to as switch cabinet) for a three-phase AC 50Hz system 3.6,7.2,12KV as acceptance and distribution of electric energy, suitable for frequent operation occasions, the bus system as a single bus (can derive a single bus with bypass and dual bus architecture). The switchgear line with national standards GB3906-91 "3 ~ 35KV AC metal-enclosed switchgear" and GB standard IEC298 requirements, and there are two proposed "Five Anti" lockout feature.

The switchgear main switch ZN28-12 series of vacuum circuit breakers, equipped with CDI7 series electromagnetic actuator or CT19 Series spring actuator, rotary isolation switch with GN30-12 GN22-12 isolation switch or high-current isolation switch series products.

Use of the environment

◆ The ambient temperature limit + 40 ℃; lower limit of -5 ℃;

◆ altitude less than 1000m;

◆ mean daily relative humidity less than 95%, on average less than 90%;

◆ earthquake intensity does not exceed 8 degrees;

◆ no fire, explosion, serious pollution, chemical corrosion and severe vibration place.

◆ environmental conditions beyond the above, the user should consult with the manufacturer.

Model and meaning

Performance Parameters

◆ switchgear technical data in Table 1;

◆ Technical Data breaker and operating mechanism in Table 2, the vacuum breaker switchgear based.

◆ grounding switch technical data, technical parameters of the ground should be able to switch to the corresponding parameters with isolation switch, grounding switch so dynamic and thermal current, the contact pressure with the corresponding separated off from the same, but the distance between Earth switch fracture does not less than 125mm.

XGN2-12外形安裝圖

◆ switchgear installation dimensions see chart

◆ Structure

The metal-enclosed switchgear for the box-type structure, the cabinet frame from angle iron welded cabinet is divided into circuit breaker room, bus room, cable room and relay room. Separated by a steel plate between the chamber and the chamber.

Circuit breaker compartment in the lower cabinet, drive circuit breakers connected by rod and actuator; under current transformer and circuit breaker terminal connected to the current transformer isolation switch with terminal connection on the terminal and the circuit breaker isolation switch terminals want to connect the circuit breaker compartment also features a pressure release channel, if an internal arc occurs, the gas can be released through the exhaust passage pressure.

After the bus room in the upper cabinet, the cabinet in order to reduce the height of the bus was a product shaped arrangement, with porcelain insulators support flexural strength of 7350N, the bus and the end of the isolation switch wiring connections.

Cable compartment in the lower part of the rear of the cabinet, cable indoor support insulators can be provided with monitoring devices, cables fixed to the bracket. For the wiring of contact solution is that the room was to contact the cable room.

Breaker operating mechanism being installed in the lower left position, the top of the isolation switch operation and interlock mechanism.

Switchgear for double-sided maintenance, relay room in front of the secondary component overhaul, maintenance actuator, maintenance on the bus and the cable terminal mechanical interlock and transmission parts, repair circuit breakers, back in the breaker room and cable room are equipped with lighting.

Underneath the front of the cabinet is provided with a width direction parallel to the ground copper bus bar, its cross-section 4 * 40mm2 mechanical interlock: In order to prevent the division with a load isolation switch; prevent misclassification error breaker; prevent straying a little space; prevent grounding switch live together; prevent closing with ground knife. Switchgear with the corresponding mechanical interlock, mechanical interlock operation principle is as follows:

◆ power operation (Run → overhaul)

Switchgear in the working position, namely the upper and lower isolation switch, circuit breaker is closed, the front and back doors locked shut, and is charged to run into, when the small handle in the working position.

First off the circuit breaker, and then pull the small handle to "breaking lock" position, then the circuit breaker can not switch on, the operating handle into the hole under quarantine operation, from the pull-down, and then push up the grounding switch is closing position, then can pull the small handle to "overhaul" position, the first to open the front door, take out the back door if the back door open, power operation is completed, maintenance personnel can breaker room and cable room for maintenance and repair.

◆ power transmission operations (maintenance → Run)

Ruoyi overhaul is completed, you need to send power, its operating procedures are as follows:

The back door locked shut, shut the front door after removing the key, pull the small handle from the service position to "divide lock" position, when the front door is locked and can not switch on the circuit breaker, grounding switch operation hole insert with operating handle, from on the drop-down, the grounding switch is in the OFF position, the operating handle winning, and then insert the isolation operation hole, pushed up from the bottom, so that isolation in the closing position, remove the operating handle, pull the small handle to work position, then you can switch on the circuit breaker.

Installation, adjustment and maintenance

◆ Installation

◆ power vacuum circuit breaker in the closing minutes when produced, up, down about 7840N, this data provides the basis for estimation of stress during design basis.

◆ foundation

Referring to Figure 2 basis switchgear careful design and construction, the foundation should be flat.

◆ Setup and Notes

a. The switchgear according to the arrangement is placed on the basis of a set of adjusting straightness good switchgear, vertical, horizontal degrees and with M12 bolts or by welding methods switchgear fastened on the basis of the slot

Steel on

. b with M12 × 30 bolts link between the cabinet;

. c install the main bus, bus room to open the top cover plate installed after a good tight jacking plate, connecting busbar contact surfaces;

d install a cable to connect to the bus contact surface should be smooth, the contact surface coated with petroleum jelly after neutral, and tighten the application partition after the cable compartment cable construction and the cable trench packer.;

. e indirectly connected cabinet bus, so arranged along the direction of fused switchgear, and protective earth grounding checks whether there are any omissions, whether continuous conduction ground loops, grounding resistance should be less than 1000μΩ;

f. install secondary circuit cable, the cable from the left side of the body at the end penetration, along the side wall into the relay room, divided to the corresponding terminal block, the construction should pay attention to the cable numbers, terminal numbers do not leak or wear Chuancuo, two second cable construction finished, do not forget the cover note cable holes.

◆ acceptance test and put into operation before the preparatory work

◆ Acceptance Test Project

. a model based on electrical components installed inside check ordering information, specifications are consistent;

. b check for loose fasteners, found loose and should be tightened;

. c Check the bus connection, the contact is tight and, if exposed, should be repaired;

. d manual isolation switches, circuit breakers, and other mechanical interlock program 3-5 times, no stuck phenomenon should be flexible, and accurate action, the program is correct;

. e Check the circuit breaker, the mechanical properties of the isolation switch, meets the requirements of its own provisions;

. f Check the secondary wiring meets the requirements of the drawings, the main circuit is not energized in the case of the secondary circuit is energized action test, compliance with the requirements of secondary wiring diagrams;

g. secondary circuit dielectric strength test between the conductor and the outer casing, applying AC 50HZ, voltage 2000V, which lasted 1min, there should be no breakdown discharge phenomenon, the secondary circuit in the electronics portion of the test voltage production plant with a user agreed ;

h. the main circuit power frequency voltage insulation test, in accordance with the relative and alternate rated voltage switchgear, according to GB311. 85% of the specified value for 1min should be no breakdown flashover.

◆ operational preparations

. a need oiling activities at the site should note lubricants;

. b connected to control, signaling, lighting and other power;

. c in isolating switches, circuit breakers, etc. while in sub-gate status, which means that motivated breaker cabinet;

. d voltage switchgear transformer isolation closed, check the voltmeter is correct, if the right to go ahead;

. e Close the arrester, isolation transformers and related auxiliary appliances make operational the station;

f. Close the feeder circuit breaker of turn, check the meter is correct.

◆ maintenance and repair

After ◆ ◆ switchgear into operation, monitoring and maintenance work as follows;

. a cleaning various parts of the dust, especially dust insulating surface;

. b overhaul program locks and mechanical connection pins, remain flexible and reliable operation, the program is correct;

. c by circuit breakers, disconnectors, operating mechanism and other electrical requirements for maintenance and debugging;

. d check the electrical contact area, contact situation is good, detect ground loops, maintain continuous conduction;

e. fastening each screw, pin.

Run ◆ product acceptance and custody

◆ product can be carried out by the factory packaging and shipping after inspection, packaging, product bolted to the bottom row, during transport, except for upright not upside down, tipping, rolling, fell.

◆ by product packing list, on the whole, accessories for acceptance.

◆ before installing warehouse storage products, should prevent rain, parts. Shall be deposited in the Treasury of the original packaging, not damp; not disassemble electrical components and parts.

Random files

◆ random files include;

◆ product certification;

◆ installation manual;

◆ second construction wiring diagram;

◆ packing list.

Wearing parts, accessories and spare parts

◆ proper circuit breakers and other electrical consumables;

◆ switchgear wearing parts, in consultation with the manufacturer determined by the user;

◆ switchgear accessories, spare parts for the type of table, use can be ordered from the manufacturer.

The main circuit combination regimen example

Ordering Information

Users must provide the following information when ordering;

◆ main circuit number and a system diagram, Pareto chart;

◆ secondary circuit wiring diagram, terminal layout map, such as when the terminal is no arrangement diagram specified by the manufacturer;

Model ◆ electrical switchgear components, specifications, quantity;

◆ main bus, bus support materials, specifications otherwise specified by the manufacturer supply;

◆ switchgear using special environmental conditions, should be made when ordering;

◆ need accessories, spares, should submit its type and quantity.


Copyright 2015 http://www.non-wovens.net All Rights Reserved Technical support:Midian

国产精品网红福利_国产精品久久午夜_亚洲免费观看视频_色综合欧美在线视频区_亚洲激情第一区_天天综合色天天_国产欧美日韩综合精品_欧美卡1卡2卡_亚洲精品自拍动漫在线_国产精品五月天
精品第一国产综合精品aⅴ| 亚洲伊人伊色伊影伊综合网| gogogo免费视频观看亚洲一| 欧美性xxxxxx少妇| 国产精品欧美一区二区三区| 久久国产尿小便嘘嘘尿| 7777精品伊人久久久大香线蕉经典版下载 | 18成人在线视频| 国产精品中文字幕一区二区三区| 5月丁香婷婷综合| 亚洲国产一区二区在线播放| 97成人超碰视| 久久99精品国产| 欧美成人精品福利| 成人av电影在线观看| 国产精品视频九色porn| 91麻豆精东视频| 欧美精品乱码久久久久久按摩| 久久国产精品99久久久久久老狼 | 奇米精品一区二区三区在线观看一| 日韩一区二区在线看| 欧美日韩一区二区三区高清| 高清不卡一区二区在线| 欧美久久久久免费| 亚洲成精国产精品女| 久久蜜臀精品av| 欧美成人激情免费网| 色婷婷久久综合| 国产精品88888| 久久66热re国产| 日韩电影一区二区三区四区| 一本一道久久a久久精品综合蜜臀| 欧美日韩综合不卡| 亚洲蜜臀av乱码久久精品蜜桃| 不卡在线观看av| 欧美在线观看18| 91.com视频| 亚洲欧洲99久久| 欧美高清视频一二三区| 日韩极品在线观看| 国产亚洲一区二区三区四区| 亚洲视频一区在线观看| 亚洲v中文字幕| 亚洲制服丝袜av| 久久久久久久久久久久久久久99| 日韩一区二区三区免费观看| 777奇米四色成人影色区| 久久综合久久综合久久综合| 亚洲精品中文字幕乱码三区| 国产中文字幕精品| 欧美中文字幕一区| 日本一区二区视频在线| 国产乱人伦精品一区二区在线观看 | 久久久久青草大香线综合精品| 99re成人在线| 18成人在线观看| 国产精品资源在线看| 成人久久久精品乱码一区二区三区| 国产尤物一区二区| 欧美激情一区二区三区蜜桃视频| 日韩激情一二三区| 在线视频观看一区| 日韩毛片一二三区| 国产亲近乱来精品视频| av亚洲精华国产精华精华| 亚洲欧美国产高清| 337p亚洲精品色噜噜| 日韩成人av影视| 精品国产三级电影在线观看| 日韩一区欧美二区| 国产精品美女久久久久aⅴ国产馆 国产精品美女久久久久av爽李琼 国产精品美女久久久久高潮 | 国产成人免费在线视频| 亚洲欧洲一区二区在线播放| 亚洲激情在线播放| 日韩美女视频一区二区| 91成人国产精品| 成av人片一区二区| 国产精品一区在线| 奇米精品一区二区三区在线观看 | 在线免费观看视频一区| 国产三级三级三级精品8ⅰ区| 国产成人免费视频一区| 国产美女精品人人做人人爽| 亚洲高清三级视频| 国产精品一二二区| 99久久精品免费| 久久精品国产99久久6| 精品久久国产老人久久综合| 国产寡妇亲子伦一区二区| 色综合色综合色综合色综合色综合| 这里只有精品99re| 亚洲伦在线观看| 91亚洲男人天堂| 亚洲欧美色一区| 91黄色激情网站| 不卡视频在线观看| 91在线观看一区二区| 日韩美女视频19| 欧美日产在线观看| 国产在线乱码一区二区三区| 精品国产凹凸成av人网站| 国产精品香蕉一区二区三区| 国产欧美日韩一区二区三区在线观看 | 奇米色777欧美一区二区| 日韩不卡免费视频| 日韩欧美在线网站| 成人黄色国产精品网站大全在线免费观看 | 国产精品久久久久aaaa樱花| 国产一区二区视频在线| 色综合一个色综合亚洲| 日韩欧美电影在线| 中文字幕制服丝袜成人av| 亚洲特黄一级片| 99国内精品久久| 欧美综合一区二区| 国产精品久久看| 国产精品日日摸夜夜摸av| 日本不卡一二三区黄网| 欧美日本精品一区二区三区| 欧美怡红院视频| 26uuu精品一区二区在线观看| 欧美大片一区二区三区| 久久综合中文字幕| 视频一区二区中文字幕| 3atv在线一区二区三区| 欧美一区二区三区四区在线观看| 亚洲人成人一区二区在线观看| 91视频在线观看| 亚洲成人黄色小说| 欧美亚洲动漫制服丝袜| 欧美日韩在线播放三区四区| 欧美成人午夜电影| 亚洲一区二区视频| 2020国产精品久久精品美国| 蜜桃av一区二区在线观看| 精品国产一区二区在线观看| 久久青草欧美一区二区三区| 久久久久国产精品麻豆ai换脸 | 久久免费电影网| 午夜精彩视频在线观看不卡| 欧美激情综合在线| 在线播放91灌醉迷j高跟美女| 蜜桃视频免费观看一区| 色婷婷综合视频在线观看| 国产亚洲欧美日韩俺去了| 91精品国产综合久久久久| av不卡一区二区三区| 国产精品欧美一级免费| 热久久免费视频| 欧美三级视频在线观看| 国产精品一级在线| 95精品视频在线| 国产精品久久久久久亚洲毛片 | 亚洲视频狠狠干| 国产福利一区二区三区| 不卡的av网站| www久久久久| 一级特黄大欧美久久久| 91行情网站电视在线观看高清版| 欧美va亚洲va香蕉在线| 国产精品久久久久永久免费观看 | 白白色亚洲国产精品| 日韩三级av在线播放| 国产精品久久综合| 国产乱子伦一区二区三区国色天香| av不卡在线播放| 精品国产污污免费网站入口 | 亚洲成a人v欧美综合天堂下载| 久久久久久97三级| 精品国产91洋老外米糕| 婷婷激情综合网| 久久久久九九视频| 亚洲午夜av在线| 在线观看亚洲a| 亚洲夂夂婷婷色拍ww47| 欧美一区二区三区系列电影| 欧美国产1区2区| 欧美一区二区三区免费观看视频 | 秋霞成人午夜伦在线观看| 欧美第一区第二区| 欧洲精品一区二区三区在线观看| 一区二区在线观看免费视频播放| 一本久久综合亚洲鲁鲁五月天| 亚洲国产欧美在线| 国产亚洲一二三区| 欧美午夜宅男影院| 成人国产精品免费观看| 麻豆国产欧美日韩综合精品二区| 精品国产免费一区二区三区四区| 韩国av一区二区| 蜜臀av性久久久久蜜臀aⅴ四虎| 日韩欧美自拍偷拍| 欧美专区日韩专区| 国产成人精品免费视频网站| 日日摸夜夜添夜夜添国产精品| 中文字幕在线不卡视频| 久久精品人人做人人爽97| 一区二区三区精品在线观看| 亚洲伦在线观看| 亚洲成人av福利|