KYN28-24KV armored remove AC metal-enclosed switchgear

Oroduct Overview

ZHE JIANG BOGUANG ELECTRICAL TECHNOLOGY CO.,LTD. has been committed to product quality control and enterprise management "manufacturing high-quality goods, integrity service" is always our commitment to the customer. The company produces crystal sales of customers is the main power supply bureau, the company (hereafter called sacsc), mechanical and electrical equipment company, best-selling domestic provinces and cities autonomous regions, many times by the national key factory, export Europe and Africa southeast Asia etc, in use process to get the user high praise!

Outline

KYN28-24 (ZK) (GZS1) armored withdrawable AC metal-enclosed switchgear (hereinafter referred to as "switching equipment"), for three-phase AC 50Hz power system for receiving and distributing power and circuit implementation of control, protection and monitoring.

Product meets the standards: GB3906-2006 "3.6-40.5kV AC metal-enclosed switchgear and control equipment", GB / T11022 "high-voltage switchgear and control equipment standards common technical requirements", IEC62271: 200 "52 less than the rated voltage 1kV AC metal-enclosed switchgear and control equipment ", DL / T404" indoor AC high voltage switchgear ordering technology. "

Model and meaning

Conditions of Use

◆ The ambient air temperature: maximum temperature 40 ℃, the lowest temperature -15 ℃

◆ Relative humidity: daily average of not more than 95%, the average vapor pressure not exceeding 2.2Kpa on average less than 90%, the average monthly water vapor pressure does not exceed 1.8Kpa

◆ Altitude: 1000m and below

◆ earthquake intensity: no more than 8 degrees.

◆ ambient air should not be obviously polluted corrosive or flammable gases, water vapor.

◆ no recurrent severe vibration.

◆ When environmental conditions than under normal use GB3906 provisions, negotiated by users and manufacturers;

Technical parameters

Note: The current transformer short-circuit capacity to be considered separately;

Product Structure

◆ switchgear structure (see Figure 1).

◆ Full metal armor, assembly structure, wide combination regimen.

◆ cabinet made of imported aluminum and zinc plating steel sheet by MlNGE machining, the use of advanced multi-fold process, with rivet nut, bolt connection, high precision and light weight, the degree of high-strength, parts versatility.

◆ Can be equipped VS1-24 series or import VD4 series vacuum circuit breaker, wide applicability, high reliability, maintenance-free for many years to achieve.

◆ handcart set to work, test location, each location has to locate and display device, safe and reliable.

◆ Used by all types of building blocks modulus change, to ensure that the car can be freely interchangeable with the specifications, with no specifications of the car must not enter.

◆ grounding switch installation

a. in the middle of loading (Front) after the cabinet for easy maintenance overhaul sided (Figure -1a).

b. in the rear loading (Rear) to facilitate the wall to save space area (Figure -1b).

◆ Current Transformer Installation:

a. After the cabinet room of the cable being installed.

b. Bend the bottom of a large plate lifting.

◆ cable compartment can be equipped with up to nine single-core cables.

◆ hyperbaric chambers are each relief channel, ensure personal safety.

◆ highly reliable interlock device, fully meet the "Five Anti" safety requirements.

◆ transported by special truck trolley, easy operation, and flexible.

◆ front door with observation windows, can easily observe the working status of interior components.

Dimensions (see Figure 2, Table 3)

Dimensions (see Figure 2, Table 3)

Transportation, installation and commissioning

· Transport and Storage Considerations

a, product handling, transportation allowed tipping, inverted and subjected to severe vibration, slings should be placed in boxes or switching equipment designated site;

b, to prevent rain, in order to avoid product moisture;

When c, switching equipment arrived at the scene, the consignee shall inspect the goods packaging is intact, whether the goods damaged or missing, notify the supplier if necessary to jointly inspect the scene;

d, shelving products should be smooth, not disassemble electrical components and parts.

· Switching equipment installation

a, the basic framework surface should be smooth and the floor above the 2 ~ 4mm, frame flatness and straightness tolerances of 1mm / m;

b, on the basis of the frame by one in order to adjust the position of the switch cabinet stitching, verticality of not more than 2mm. When the switch to more than 10 the number of cabinet from among the best start assembling. Switchgear and base frame base frame with bolted or welded;

c, to facilitate the installation of the main bus switching equipment installation LCL should be installed with the main bus alternately;

d, with pre-installed by grounding busbar switchgear cabinets main ground bus, grounding device will switch the main ground bus and power distribution room very connected;

After e, and secondary cable once the installation is complete, to plugging the gap around the cable glands and installed seal plates and separators.

Debugging · switchgear

a, inspection and quarantine contacts and insertion depth contact is good;

After b, switching equipment installed to conduct operational tests, manually operated circuit breakers, trolley and grounding switches and other components, and check the operation of all mechanical linkage program, the action to be accurate, no card phenomenon should be flexible;

maximum, minimum operating voltage of mechanical properties c, check the circuit breaker meets the requirements to operate in accordance with the provisions of the test, combined points should be normal;

d, the secondary loop current test to check the correctness of the protection, control and signal circuits actions;

e, the main loop resistance measurement, loop resistance of the circuit breaker should not exceed the standard specified value;

f, the main circuit between white and relatively frequency voltage withstand test, carried out according to the provisions of the transfer and acceptance;

g, the secondary circuit dielectric strength test 2000V / 1min. There should be no breakdown flashover. Secondary circuit electronics part, the test voltage agreed by the user and manufacturer.

Switching equipment maintenance and repair

Equipment / components (such as wearing parts) inspection and maintenance intervals, depending on its length running time, the frequency of operation and fault situations, such as breaking. Depending on the operating conditions and site environment, every 3 to 5 years for switching equipment to conduct an inspection and maintenance.

? Press the vacuum circuit breaker manual requirements, check the operation of the circuit breaker and operating mechanism, and make the necessary adjustments and lubrication;

? Check trolley into the car, the bus the whole process of working conditions, adjust and lubricate if necessary;

· Check the interlock device is flexible and reliable; adjust and lubricate as necessary;

? Check the dynamic and static isolation contact contact surfaces without damage, the insertion depth to meet the requirements, whether the spring pressure weakened, surface coating without abnormal oxidation and replace obsolete conductive paste on isolating contacts;

? Check the bus and the exposure of each conductive connection parts and fastening, surface heating phenomenon found to be processed;

? Check the ground loop section circumstances, such as exposure to ground contact, the main ground wire and grounding wire to get married, to ensure the continuity of its conductivity;

· Wipe the dust vacuum interrupter and insulation surface with a soft cloth. As a result of condensation resulting in partial discharge phenomena, may be coated with a thin layer of grease discharge surface as a temporary repair.

Random files

Product certification;

· Factory inspection report;

· Installation instructions;

· Secondary wiring diagram;

· Packing List

· Special tools;

· The main components of the switching device's instruction manual and other technical documents and attachments.

Ordering Information

· The main circuit of Figure number, use and single-line system diagram Rated voltage Rated current Rated short-circuit breaking current, power distribution room layout and arrangement of equipment, such as switches configuration diagram.

· Switchgear require control, measurement and protection functions and requirements and other automatic locking device.

· Switch the main electrical components inside the device model, size and quantity.

·  If required bus line counters or bridge connection between switching equipment, provides bus rated ampacity of the bridge, the bridge spans the bus, from the ground height data and other specific requirements.

· Switching equipment used when special environmental conditions, should be specified when ordering.

· Other special requirements.


Copyright 2015 http://www.non-wovens.net All Rights Reserved Technical support:Midian

国产精品网红福利_国产精品久久午夜_亚洲免费观看视频_色综合欧美在线视频区_亚洲激情第一区_天天综合色天天_国产欧美日韩综合精品_欧美卡1卡2卡_亚洲精品自拍动漫在线_国产精品五月天
日本一区二区视频在线观看| 91一区二区三区在线播放| 日韩精品一卡二卡三卡四卡无卡| 国产精华液一区二区三区| 日韩精品在线看片z| 欧美aⅴ一区二区三区视频| 51精品国自产在线| 国产在线精品不卡| 国产日韩欧美精品综合| 成人性生交大片免费看在线播放| 中文字幕中文字幕中文字幕亚洲无线| 成人在线综合网站| 亚洲美女一区二区三区| 91黄色免费版| 水野朝阳av一区二区三区| 精品国产乱码久久久久久牛牛 | 色综合咪咪久久| 亚洲一二三四在线| 777午夜精品免费视频| 国产精选一区二区三区| 日韩一区在线播放| 欧美不卡123| 91性感美女视频| 久久精品国产澳门| 悠悠色在线精品| 2021国产精品久久精品| 欧美综合一区二区三区| 国产成人精品免费网站| 日韩精品91亚洲二区在线观看| 久久天天做天天爱综合色| 欧美性感一区二区三区| 国产盗摄精品一区二区三区在线| 亚洲成人你懂的| 亚洲另类中文字| 中文一区在线播放| 日韩精品一区二区三区中文不卡 | 亚洲精品欧美在线| 国产精品美女久久久久aⅴ国产馆 国产精品美女久久久久av爽李琼 国产精品美女久久久久高潮 | 成人av在线影院| 美女视频黄 久久| 亚洲午夜精品久久久久久久久| 国产亚洲福利社区一区| 日韩三级免费观看| 欧美一区二区视频在线观看2022 | 免费在线观看成人| 日韩中文字幕区一区有砖一区| 国产精品国产三级国产aⅴ入口| 日韩一区二区电影| 欧美一区二区三区免费大片| 欧美色涩在线第一页| 欧美日韩国产片| 欧美区在线观看| 91精品国产综合久久久久久久 | 欧美撒尿777hd撒尿| 欧美日韩成人在线| 91精品国产综合久久福利软件| 91精品国产综合久久婷婷香蕉| 欧美日韩不卡在线| 日韩欧美的一区| 欧美精品一区二区精品网| 久久亚洲欧美国产精品乐播| 久久精品人人做人人综合| 久久久久国产精品人| 国产女人18水真多18精品一级做| 亚洲国产高清在线| 亚洲高清不卡在线观看| 男女性色大片免费观看一区二区| 免费三级欧美电影| 国产福利一区二区三区| 91一区二区在线| 日韩视频免费观看高清完整版在线观看| 国产精品夫妻自拍| 亚洲欧美日韩国产另类专区| 亚洲精品成人天堂一二三| 亚洲国产精品一区二区www | 亚洲国产精品人人做人人爽| 日韩中文字幕麻豆| 国产成人精品三级| 91国产精品成人| 欧美大片在线观看| 国产日韩精品久久久| 又紧又大又爽精品一区二区| 日韩av一级片| 97国产精品videossex| 欧美一级国产精品| 中文字幕佐山爱一区二区免费| 日韩国产精品久久| 99久久婷婷国产综合精品| 日韩欧美一级在线播放| 亚洲人123区| 精品一区二区三区在线观看国产 | 成人av影视在线观看| 欧美一区二区啪啪| 亚洲理论在线观看| 本田岬高潮一区二区三区| 精品人在线二区三区| 午夜视频一区二区三区| 99视频一区二区三区| 国产午夜精品理论片a级大结局| 日本午夜精品视频在线观看| 欧洲一区在线电影| 日韩理论片网站| 风间由美一区二区三区在线观看 | 欧美成人性福生活免费看| 亚洲成人精品一区| 欧美中文字幕一区| 一区二区久久久久久| 91一区一区三区| 亚洲免费av在线| 91首页免费视频| 国产精品乱码一区二三区小蝌蚪| 极品美女销魂一区二区三区| 欧美一区二区三区在线观看视频| 亚洲国产精品尤物yw在线观看| 色老汉一区二区三区| 亚洲国产精品久久人人爱 | 日本欧美肥老太交大片| 91精品国产福利在线观看| 日韩影视精彩在线| 欧美mv和日韩mv的网站| 蜜臀av性久久久久蜜臀aⅴ四虎 | 91影院在线观看| 亚洲日本一区二区| 欧美一a一片一级一片| 亚洲bt欧美bt精品777| 欧美日本高清视频在线观看| 日韩电影在线一区二区| 欧美精品一区二区三区蜜臀| 国产白丝网站精品污在线入口| 中文一区在线播放| 一本久久精品一区二区| 视频一区欧美精品| 国产三区在线成人av| 成人黄色综合网站| 丝袜亚洲精品中文字幕一区| 久久一二三国产| 91视频在线看| 国产一区二区三区久久久 | 亚洲美女免费视频| 精品成人一区二区三区| 91性感美女视频| 久久精品国产在热久久| |精品福利一区二区三区| 9191精品国产综合久久久久久| 久久se这里有精品| 一区二区三区免费在线观看| 久久久亚洲精品一区二区三区| 91亚洲大成网污www| 国产综合色在线| 亚洲成人一区在线| 国产精品成人一区二区三区夜夜夜| 欧美另类久久久品| 91网上在线视频| 成人一区二区三区视频 | 久久精品国产在热久久| 亚洲精品日日夜夜| 欧美国产视频在线| 久久蜜臀精品av| 欧美一级在线视频| 欧美美女一区二区| 欧美探花视频资源| 色综合久久久网| 成人午夜在线播放| 紧缚捆绑精品一区二区| 亚洲成人免费视频| 亚洲最大成人综合| 一二三四社区欧美黄| 亚洲欧洲av另类| 专区另类欧美日韩| 国产精品蜜臀在线观看| 日本一区二区三区视频视频| 久久久午夜精品理论片中文字幕| 日韩美女天天操| 欧美成人video| 日韩欧美中文一区| 日韩欧美的一区二区| 日韩一区二区三区电影在线观看| 欧美精品色综合| 日韩视频在线观看一区二区| 日韩精品一区二| 国产网站一区二区| 亚洲三级在线免费观看| 亚洲六月丁香色婷婷综合久久 | 欧美亚洲国产一区二区三区va| 91久久精品午夜一区二区| 欧美三级午夜理伦三级中视频| 欧美三级欧美一级| 欧美成人一区二区三区片免费| 精品久久久久久久久久久久包黑料| 欧美xxxx老人做受| 中文字幕日韩欧美一区二区三区| 中文字幕一区二区三区不卡| 一区二区三区精品久久久| 日本中文字幕不卡| 成人国产精品免费观看视频| 99re8在线精品视频免费播放| 精品视频1区2区3区| 久久嫩草精品久久久久| 亚洲精品国产品国语在线app| 免费不卡在线观看|